• Pipeline Stations

PETCO Pump Station 1

Pipeline first station, Distant is 0000 KM, elevation is 396.5 M, it has four main line pumps: two pumps 580 m3 capacity for each another two 1000 m3 capacity for each.

PETCO Pump Station 2

Pipeline second station, Distant is 236 KM, elevation is 735 M, it has three main line pumps with 1000 m3 two capacity for each and two power generators.

ElObeid Metering Station (OMS)

Supply ElObeid refinery with crude oil through metering skid (three streams with 57 m3 for each), Distant is 400 KM, elevation is 553 KM.

PETCO Pump Station 3

Pipeline Third station, Distant is 547 KM, elevation is 421 M, it has Five main line pumps with 580 m3 capacity for each with three power Generators.

khartoum Metering Station (KMS)

Supply khartoum refinery with crude oil through metering skid (three streams with 227 m3 for each), Distant is 817 KM, elevation is 410 KM.

PETCO Pump Station 4

Pipeline Fourth station, Distant is 418 KM, elevation is 410 M, it has three main line pumps with 1000 m3 capacity for each with two power Generators and supply power from NEC (National Electricity).

PETCO Pump Station 5

Pipeline Fifth station, Distant is 1086 KM, elevation is 376 M, it has four main line pumps with 580 m3 capacity for each with three power Generators and supply power from NEC (National Electricity).

PETCO Pump Station 6

Pipeline Sixth station, Distant is 1317 KM, elevation is 647 M, it has four main line pumps with 580 m3 capacity for each with three power Generators and supply power from NEC (National Electricity).. TE-IN for SPOC crude Oil- after 126 KM from PS1 PetroEnergy stream TE-IN.

PETCO Marine Terminal

Marine Terminal is the terminal station, Distant is 1506 KM, elevation is 16 M, it has eight storage tank, 400 K/ tank, four Booster & four Shipping Pumps, Five Generators (mobilized to upstream on june, 2012 Currently Power Supply through NEC) and exporting via SPM (Single Point Mooring).